Image shows construction in Graham House. There are wooden walls, wooden beams and other building equipment throughout the picture. Annotation on slide reads, "Graham House renovation, March 1993.".
Image shows a Green College residence building under construction from a profile view. Annotation on slide reads, "Green College construction, March '93"
Image shows the central Green College triangle. Trees and residences line either side of the grassy triangle. In the background, there is a vehicle. Annotation on slide reads, "Green College construction March 1993".
Image shows a landscape of trees and mountains behind a short rock wall, likely taken behind the Gibson Room in Graham House In the foreground, there are pipes, beams, and other building materials. Annotation on slide reads, "Green College construction March '93".
Image shows three construction workers in the foreground of a nearly completed Green College building. Annotation on slide reads, "Green College construction, March '93".
Image shows a Green College residence building under construction through foliage. Image is likely of the residences in A North, taken from B East. Annotation on slide reads, "Green College under const'n, March '93"
Image shows a completed Green College building, with black sloped roofing and windows on the left and a building under construction on the right. Annotation on slide reads, "Green College, March '93"
Image shows the renovation of Graham house in 1993. There are construction materials and tarpaulin lying in a large room with wooden walls. Slide annotation reads, "Graham House renovation March 1993".
Image shows a Green College residence under unit under construction. The picture depicts a building with a window. Annotation on slide reads, "Green College construction, March '93".
Image shows A South residences in Green College under construction, taken from Cecil Green Park Rd. It shows a row of units made of wooden beams and ceilings. Annotation on slide reads, "Green College Construction March 1993"